How to Install the Traulsen SER-60711-05 Control Kit: Complete Installation Guide
Key Takeaways
| Key Point | Details |
|---|---|
| Kit Purpose | Converts MIT to NGC RAG Reach-in Freezer 232DNWLHUT 115V |
| Installation Time | 2-3 hours with proper preparation |
| Required Tools | Screwdrivers, wire strippers, multimeter, refrigeration gauges |
| Safety Priority | Complete power disconnection before beginning work |
| Post-Installation | 24-hour monitoring period recommended |
The Traulsen SER-60711-05 KIT MIT TO NGC RAG REFFRZ 232DNWLHUT 115 represents a critical upgrade component for converting older MIT control systems to the modern NGC RAG configuration. At Malachy Parts Plus, we understand that proper installation of this control kit is essential for maintaining optimal freezer performance and extending equipment life. This comprehensive guide walks you through every step of the installation process, ensuring professional results and reliable operation. The kit is specifically designed for reach-in freezer applications and requires careful attention to electrical connections, refrigeration components, and control system integration.
Understanding the SER-60711-05 Control Kit Components
NGC RAG Control Board
The heart of the conversion kit, featuring advanced temperature control algorithms and enhanced diagnostic capabilities for superior freezer performance.
The SER-60711-05 kit contains multiple precision-engineered components that work together to transform your existing MIT system into a modern NGC RAG configuration. The primary component is the NGC RAG control board, which offers improved temperature stability and enhanced diagnostic features compared to the older MIT system. Additional components include updated wiring harnesses, temperature sensors, and connection adapters specifically designed for the 232DNWLHUT 115V freezer model. Understanding each component's function is crucial for successful installation and optimal system performance.
| Component | Function | Installation Priority |
|---|---|---|
| NGC RAG Control Board | Main temperature control and system monitoring | Primary |
| Wiring Harness | Electrical connections between components | Secondary |
| Temperature Sensors | Accurate temperature monitoring and feedback | Critical |
| Connection Adapters | Interface compatibility with existing components | Supporting |
Pre-Installation Preparation and Safety Requirements
Before beginning installation of the SER-60711-05 kit, proper preparation ensures both safety and installation success. Disconnect all electrical power to the freezer unit at the main breaker and verify complete power disconnection using a multimeter. Remove all products from the freezer and allow the unit to defrost completely, as ice buildup can interfere with component access and create safety hazards. Gather all necessary tools including insulated screwdrivers, wire strippers, electrical tape, and appropriate personal protective equipment.
Safety Step 1: Power Isolation
Disconnect power at the main breaker and verify with a multimeter. Lock out the breaker to prevent accidental re-energization during installation.
Safety Step 2: Refrigeration System Preparation
Ensure refrigeration gauges are available for system pressure monitoring and have refrigerant recovery equipment ready if needed.
Document the existing MIT control system configuration with photographs and detailed notes before removal. This documentation proves invaluable if troubleshooting becomes necessary during or after installation. Verify that you have received all components listed in the kit documentation and inspect each component for shipping damage. Having the proper Traulsen control components readily available prevents installation delays and ensures system compatibility.
Step-by-Step Installation Process
The installation process requires systematic removal of the existing MIT control system followed by careful installation of the new NGC RAG components. Begin by carefully removing the existing MIT control board, taking note of all wire connections and their positions. Use masking tape to label each wire connection before disconnection, ensuring proper reconnection to the new control board. Remove the old temperature sensors and associated wiring, as these components are not compatible with the NGC RAG system.
Step 3: Control Board Installation
Mount the new NGC RAG control board in the designated location, ensuring proper spacing for ventilation and service access. Secure with provided mounting hardware.
Step 4: Sensor Installation
Install new temperature sensors in the specified locations, ensuring proper thermal contact and protection from physical damage. Route sensor cables away from heat sources.
Install the new wiring harness according to the provided schematic, making all connections tight and secure. Double-check each connection against the installation diagram before proceeding to the next connection. The NGC RAG system requires precise wiring connections for optimal performance, and incorrect wiring can result in system malfunction or component damage. Similar attention to detail is required when installing other Traulsen components to ensure system reliability.
System Configuration and Initial Testing
Once all physical connections are complete, configure the NGC RAG control system according to the specific requirements of your 232DNWLHUT freezer model. Access the control board programming mode using the sequence outlined in the installation documentation. Set the appropriate temperature parameters, defrost cycles, and alarm thresholds for your specific application requirements. The NGC RAG system offers advanced configuration options that provide superior temperature control compared to the original MIT system.
| Configuration Parameter | Recommended Setting | Notes |
|---|---|---|
| Set Point Temperature | 0°F (-18°C) | Adjust based on product requirements |
| Defrost Frequency | 4 times per day | May vary with usage patterns |
| Temperature Differential | 3°F (1.7°C) | Prevents short cycling |
| High Temperature Alarm | 10°F (-12°C) | Early warning protection |
Perform initial system testing by restoring power and monitoring the control system's response. Verify that all temperature sensors are reading correctly and that the refrigeration system cycles properly. The NGC RAG system should display current temperatures and system status clearly on the control panel. Monitor the system for at least one complete defrost cycle to ensure proper operation.
Post-Installation Monitoring and Troubleshooting
After successful installation and initial testing, implement a comprehensive monitoring protocol to ensure optimal system performance. Monitor temperature logs for the first 24 hours of operation, documenting any irregularities or unexpected behavior. The NGC RAG system provides enhanced diagnostic capabilities that can help identify potential issues before they affect product quality or system reliability.
System Performance Monitoring Chart
Temperature Accuracy
Energy Efficiency
System Reliability
Common post-installation issues include temperature sensor calibration drift, incorrect defrost timing, or communication errors between control components. The NGC RAG system's diagnostic features provide detailed error codes and system status information that simplifies troubleshooting. Keep detailed records of system performance, including temperature logs, defrost cycle times, and any alarm conditions. This documentation proves valuable for warranty purposes and helps identify patterns that may indicate developing issues. Regular maintenance of the newly installed control system ensures long-term reliability and optimal performance. Clean the control board housing monthly to prevent dust accumulation that can cause overheating. Verify that all electrical connections remain tight and secure, as thermal cycling can cause connections to loosen over time. Consider installing additional components such as the Traulsen SER-60509-01 air duct installation kit to further optimize system performance.
Conclusion and Professional Support
Successfully installing the Traulsen SER-60711-05 control kit transforms your reach-in freezer from an older MIT system to a modern NGC RAG configuration, providing enhanced temperature control, improved energy efficiency, and superior diagnostic capabilities. The installation process requires careful attention to safety protocols, systematic component replacement, and thorough testing to ensure optimal results. At Malachy Parts Plus, we provide genuine OEM components and comprehensive support to ensure your installation success. Professional installation of control system upgrades like the SER-60711-05 kit represents a significant investment in equipment reliability and operational efficiency. The NGC RAG system's advanced features provide superior temperature stability, reducing product loss and extending equipment life. Consider upgrading other control components such as the Traulsen SK-337-60319-CAA-GF1 control head for comprehensive system optimization. For complex installations or when questions arise, consult with qualified refrigeration technicians who have experience with Traulsen control systems. Our team at Malachy Parts Plus stands ready to provide technical support and genuine replacement parts to keep your equipment operating at peak performance. Trust our expertise in genuine OEM restaurant equipment parts to support your operational success and equipment longevity.