{"product_id":"imperial-33648-115-icvg-fan-115v-w-16-long-lead-wires","title":"Imperial 33648-115 ICVG Fan 115V w\/16\" Long Lead Wires","description":"\u003cp\u003eHere is a detailed product description for the commercial kitchen appliance part:\u003c\/p\u003e\n\n\u003cp\u003eImperial 33648-115 ICVG Fan 115V w\/16\" Long Lead Wires\u003c\/p\u003e\n\n\u003cp\u003ePart Number: 33648-115\u003c\/p\u003e\n\n\u003cp\u003eThis 115V Imperial convection fan features 16\" long lead wires for convenient installation. The steel housing and aluminum blade are durable for long-lasting performance in commercial kitchen environments. Dual ball bearings provide smooth, reliable operation. This fan meets UL and CUL safety standards and is ETL certified. With a powerful air flow capacity of 190 CFM, this 7\" fan efficiently removes heat and odors to maintain a comfortable kitchen environment. The all-metal construction is easy to clean and withstands high temperatures. Suitable for roof or wall mounting with the included mounting bracket. Backed by a 1-year warranty from Imperial.\u003c\/p\u003e","brand":"Imperial","offers":[{"title":"Default Title","offer_id":49421642891570,"sku":"33648-115","price":92.83,"currency_code":"USD","in_stock":true}],"url":"https:\/\/malachypartsplus.com\/products\/imperial-33648-115-icvg-fan-115v-w-16-long-lead-wires","provider":"Malachy Parts+","version":"1.0","type":"link"}