Need Help? 📞 (800) 794-1415

Imperial  |  SKU: 33648-115

Imperial 33648-115 ICVG Fan 115V w/16" Long Lead Wires

$92.83
Shipping calculated at checkout.
ENSURE IT'S AVAILABLE FIRST

Speak to a live agent before placing your order to ensure you get the parts you need ASAP

Contact Us

Ready to Help! Mon-Fri | 8AM-4PM

Need Authorized Service in NJ, NY?

Click Here to speak with one of our reps about how we can get your appliances services professionally by one of our certified technicians!

Here is a detailed product description for the commercial kitchen appliance part:

Imperial 33648-115 ICVG Fan 115V w/16" Long Lead Wires

Part Number: 33648-115

This 115V Imperial convection fan features 16" long lead wires for convenient installation. The steel housing and aluminum blade are durable for long-lasting performance in commercial kitchen environments. Dual ball bearings provide smooth, reliable operation. This fan meets UL and CUL safety standards and is ETL certified. With a powerful air flow capacity of 190 CFM, this 7" fan efficiently removes heat and odors to maintain a comfortable kitchen environment. The all-metal construction is easy to clean and withstands high temperatures. Suitable for roof or wall mounting with the included mounting bracket. Backed by a 1-year warranty from Imperial.

Part Imperial 33648-115 ICVG Fan 115V w/16" Long Lead Wires fits 0 models

Here is a detailed product description for the commercial kitchen appliance part:

Imperial 33648-115 ICVG Fan 115V w/16" Long Lead Wires

Part Number: 33648-115

This 115V Imperial convection fan features 16" long lead wires for convenient installation. The steel housing and aluminum blade are durable for long-lasting performance in commercial kitchen environments. Dual ball bearings provide smooth, reliable operation. This fan meets UL and CUL safety standards and is ETL certified. With a powerful air flow capacity of 190 CFM, this 7" fan efficiently removes heat and odors to maintain a comfortable kitchen environment. The all-metal construction is easy to clean and withstands high temperatures. Suitable for roof or wall mounting with the included mounting bracket. Backed by a 1-year warranty from Imperial.

Part Imperial 33648-115 ICVG Fan 115V w/16" Long Lead Wires fits 0 models

N/A
Imperial

Imperial 33648-115 ICVG Fan 115V w/16" Long Lead Wires

$92.83

Here is a detailed product description for the commercial kitchen appliance part:

Imperial 33648-115 ICVG Fan 115V w/16" Long Lead Wires

Part Number: 33648-115

This 115V Imperial convection fan features 16" long lead wires for convenient installation. The steel housing and aluminum blade are durable for long-lasting performance in commercial kitchen environments. Dual ball bearings provide smooth, reliable operation. This fan meets UL and CUL safety standards and is ETL certified. With a powerful air flow capacity of 190 CFM, this 7" fan efficiently removes heat and odors to maintain a comfortable kitchen environment. The all-metal construction is easy to clean and withstands high temperatures. Suitable for roof or wall mounting with the included mounting bracket. Backed by a 1-year warranty from Imperial.

View product